Drax Power Limited
Drax Power Station SCADA Upgrade
Morson Projects were appointed by Drax Power Ltd to carry out a SCADA Upgrade at their Power Station in North Yorkshire.
Transport For London
Rotherhithe Tunnel Control System Upgrade
Morson Projects were appointed by Transport For London to support them with the Control Systems Upgrade as part of a wider programme of works for the Rotherhithe Tunnel.
Network Rail
CTRL Training Facility
Morson Projects’ Ematics division were appointed to design and build a maintenance and staff training facility for Network Rail.
Network Rail
CTRL Tunnel Ventilation Control
Morson Projects’ Ematics division were appointed by Network Rail to provide specialist software engineering and systems assurance for implementation of the Ventilation Control System for the three CTRL tunnels.
Jacobs Engineering
Dublin Port Tunnel
Morson Projects’ Ematics division were commissioned to conduct a site survey of the Dublin Port Tunnel’s network to investigate both the design concept, current performance and reliability of it’s infrastructure.
Medway County Council
Tunnel Control, Data Communications & Electrical Subsystem Replacement
The 725 metre long Medway Tunnel is an immersed tube dual two‐lane tunnel with cut and cover approaches that was opened in 1996. As the proprietary control system had reached and of life and was no longer supported, a new SCADA control system was required to reduce risk of component failure.
Transport For London
Eastway Tunnel Lighting
Morson Projects were appointed by Transport for London to support them with a lighting upgrade at the Eastway Tunnel.
Transport For London
Hanger Lane Tunnel Lighting
Morson Projects’ Ematics division were appointed by Transport for London to support them with lighting upgrades to the Hanger Lane Tunnel.
TT2 Limited
Tyne Tunnels Control System Upgrade
Morson Projects’ were appointed by TT2 Limited as the Control Systems Integrator for some constrol system upgrades of the Tyne Tunnels.
Transport For London
Tunnels Maintenance & Capital Works
Morson Projects were appointed by Transport for London to support them with Tunnels Maintenance & Capital Works across four geographical areas.
Draw Power Limited
Control & Monitoring for Electrical Distribution System
Morson Projects were appointed by National Grid to deliver the Control & Monitoring for a new Electrical Distribution System.
Energos
Energy from Waste (Derby)
Morson Projects were appointed by Energos to support them with the design of a new Energy from Waste facility in Derby.