Leonardo

Leonardo Helicopters RCM Review

Morson Projects were appointed by Leonardo Helicopters to undertake a Reliability Centred Maintenance (RCM) Review.

GKN Aerospace

A400M Electrical Ladder Brackets

Morson Projects worked closely with GKN Aerospace to provide Aerospace Structures Design & Stress Analysis, including fatigue and damage tolerance for movable ladder brackets for the A400M.

Airbus

Landing Gear Extension Retraction System

Morson Projects were appointed by Airbus to provide Structural Design & Analysis and Systems Engineering & Integration for a new Landing Gear Extension Retraction System.

BAE Systems

CFD Modelling

Morson Projects were appointed by BAE Systems to support them with the Structural Design & Analysis, Systems Engineering & Integration and Software Development for the CFD model of a VIP aircraft.

Bombardier

Materials Allowables Development

Morson Projects were appointed by Bombardier to provide design support for the CS100 Wing to Body Fairing (WTBF).

GKN Aerospace

A350 Rear Spar

Our team provided Structural Design & Analysis, Project & Programme Management and Systems Engineering & Integration for iterations of the A350 Rear Spar (Composite and Metallic).

GE Aviation

A350 Fixed Trailing Edge (FTE)

Morson Projects were appointed by GE Aviation to provide Structural Design & Analysis and Systems Engineering & Integration for the A350 Fixed Trailing Edge (FTE).

Bombardier

C-Series Wing to Body Fairing (WTBF)

Morson Projects was responsible for the design, analysis and final approval of the entire composite Wing to Body Fairing (WTBF) for the C Series commercial aircraft.

Bombardier

CS100 & CS300 Fixed Trailing Edge (FTE)

Morson Projects’ were appointed by Bombardier to support them with the Structural Design and Analysis for CS100 & CS300 Fixed Trailing Edge.

Merseytravel

Unified SCADA System

Morson Projects’ specialist controls system division Ematics was appointed by Merseytravel to provide a unified SCADA System for two tunnels.

Greencore Group

Digital Capture for Manufacturing Facility

Our Digital Capture team were appointed by Greencore Group to support the design and engineering of a new maintenance walkway within the roof of one of their manufacturing facilities.

Electricity North West

Carrington Paper Mill

Morson Projects were appointed by Electricity North West to support Saica Containerboard UK Limited with the build of a new paper mill at Carrington.