Bombardier

Learjet 85 Joint Definition & Detail Design Phase Support

Morson Projects were appointed by Bombardier to deliver Design Phase Support for the Learjet 85.

Network Rail

CTRL Training Facility

Morson Projects’ Ematics division were appointed to design and build a maintenance and staff training facility for Network Rail.

Jacobs Engineering

Dublin Port Tunnel

Morson Projects’ Ematics division were commissioned to conduct a site survey of the Dublin Port Tunnel’s network to investigate both the design concept, current performance and reliability of it’s infrastructure.

Medway County Council

Tunnel Control, Data Communications & Electrical Subsystem Replacement

The 725 metre long Medway Tunnel is an immersed tube dual two‐lane tunnel with cut and cover approaches that was opened in 1996. As the proprietary control system had reached and of life and was no longer supported, a new SCADA control system was required to reduce risk of component failure.

Draw Power Limited

Control & Monitoring for Electrical Distribution System

Morson Projects were appointed by National Grid to deliver the Control & Monitoring for a new Electrical Distribution System.

Sellafield Ltd

E&EP Asset Group

Morson Projects were responsible for the co-ordination and delivery of task-based design work which included Mechanical, Control, Electrical & Instrumentation design packages for Sellafield Ltd. E&EP Asset Group.

Senior Aerospace

MRJ-200 Aircraft

Morson Projects were appointed by  Senior Aerospace to be responsible for the refining of the Low Pressure Ducting System design for the Mitsubishi Aircraft Corporation MRJ-200 Aircraft.