Spirit Aerospace

A350 Fixed Leading Edge (FLE)

Morson Projects were appointed by Spirit Aerosystems for the analysis and design of metallic and composite parts for the Mid and Outer Fixed Leading Edge of the A350-1000 C-MAT and DFM, including complete programme management.

Digital Capture of Warehouse and Distribution Site

Our clients who are global leaders in logistics services have a commitment to providing high quality supply chain solutions, and owing to this, our Digital Capture team were contracted to provide a digital dilapidation survey at one of their Warehouse and Distribution Sites.

Drax Power Limited

Drax Power Station SCADA Upgrade

Morson Projects were appointed by Drax Power Ltd to carry out a SCADA Upgrade at their Power Station in North Yorkshire.

Transport For London

Heavy Overhaul Programme Lift (HOPL)

Morson Projects were appointed by Transport for London to support them with their Heavy Overhaul Programme Lift (HOPL).

Transport For London

Rotherhithe Tunnel Control System Upgrade

Morson Projects were appointed by Transport For London to support them with the Control Systems Upgrade as part of a wider programme of works for the Rotherhithe Tunnel.

Network Rail

CTRL Training Facility

Morson Projects’ Ematics division were appointed to design and build a maintenance and staff training facility for Network Rail.

Network Rail

CTRL Tunnel Ventilation Control

Morson Projects’ Ematics division were appointed by Network Rail to provide specialist software engineering and systems assurance for implementation of the Ventilation Control System for the three CTRL tunnels.

Jacobs Engineering

Dublin Port Tunnel

Morson Projects’ Ematics division were commissioned to conduct a site survey of the Dublin Port Tunnel’s network to investigate both the design concept, current performance and reliability of it’s infrastructure.

Medway County Council

Tunnel Control, Data Communications & Electrical Subsystem Replacement

The 725 metre long Medway Tunnel is an immersed tube dual two‐lane tunnel with cut and cover approaches that was opened in 1996. As the proprietary control system had reached and of life and was no longer supported, a new SCADA control system was required to reduce risk of component failure.

Transport For London

Eastway Tunnel Lighting

Morson Projects were appointed by Transport for London to support them with a lighting upgrade at the Eastway Tunnel.

Transport For London

Hanger Lane Tunnel Lighting

Morson Projects’ Ematics division were appointed by Transport for London to support them with lighting upgrades to the Hanger Lane Tunnel.

TT2 Limited

Tyne Tunnels Control System Upgrade

Morson Projects’ were appointed by TT2 Limited as the Control Systems Integrator for some constrol system upgrades of the Tyne Tunnels.