TT2 Limited

Tyne Tunnels Control System Upgrade

Morson Projects’ were appointed by TT2 Limited as the Control Systems Integrator for some constrol system upgrades of the Tyne Tunnels.

Transport For London

Tunnels Maintenance & Capital Works

Morson Projects were appointed by Transport for London to support them with Tunnels Maintenance & Capital Works across four geographical areas.

Transport for Greater Manchester

Digital Capture of Rail Facility

Morson Projects were appointed by Transport for Greater Manchester (TFGM) to conduct an aerial survey of one of their rail facilities.

Siemens

Overspeed Test Rig

Morson Projects were appointed by Siemens to design, manufacture and install on-site a new overspeed test rig for one of their turbines.

Draw Power Limited

Control & Monitoring for Electrical Distribution System

Morson Projects were appointed by National Grid to deliver the Control & Monitoring for a new Electrical Distribution System.

Energos

Energy from Waste (Isle of Wight)

Morson Projects were appointed by Energos to support them with the design of a new Energy from Waste facility on the Isle of Wight.

National Grid

Mechanically Switching Capacitor (MSC)

Morson Projects were appointed by National Grid to upgrade the out-of-balance protection on their Mechanically Switching Capacitor (MSC) at a number of substations in the Midlands and the South.

Scottish Power

Protection & Control (P&C) Panels

Morson Projects have been appointed by Scottish Power to carry out a wide range of projects including design, manufacture, testing and delivery of Protection & Control Panels across their power networks.

National Grid

Heysham Operational Tripping System (OTS)

Morson Projects were appointed by the National Grid to support them on the Heysham Operation Tripping Scheme (OTS), which identified the current and future need for additional generation sources to be incorporated into the Transmission System, in the North West 1 and North West 2 regions.

Carillion

Cilfynydd 400kV Substation

Morson Projects were appointed by Carillion  to support them with the engineering for a new shunt reactor bay which was installed as an extension to the existing 400kV substation at Cilfynydd.

Sellafield Ltd

B13 Lifting Beam & Stand

Morson Projects were appointed by Sellafield Ltd to carry out the design, analysis, manufacture and CE marking for a new B13 Lifting Beam & Stand.

Horizon Nuclear Power

Consultancy Services for Wylfa Newydd

Morson Projects were appointed by Horizon Nuclear Power to provide Technical Services for the proposed Wylfa Newydd nuclear power plant in Anglesey, Wales.