TT2 Limited
Tyne Tunnels Control System Upgrade
Morson Projects’ were appointed by TT2 Limited as the Control Systems Integrator for some constrol system upgrades of the Tyne Tunnels.
Transport For London
Tunnels Maintenance & Capital Works
Morson Projects were appointed by Transport for London to support them with Tunnels Maintenance & Capital Works across four geographical areas.
Transport for Greater Manchester
Digital Capture of Rail Facility
Morson Projects were appointed by Transport for Greater Manchester (TFGM) to conduct an aerial survey of one of their rail facilities.
Siemens
Overspeed Test Rig
Morson Projects were appointed by Siemens to design, manufacture and install on-site a new overspeed test rig for one of their turbines.
Draw Power Limited
Control & Monitoring for Electrical Distribution System
Morson Projects were appointed by National Grid to deliver the Control & Monitoring for a new Electrical Distribution System.
Energos
Energy from Waste (Isle of Wight)
Morson Projects were appointed by Energos to support them with the design of a new Energy from Waste facility on the Isle of Wight.
National Grid
Mechanically Switching Capacitor (MSC)
Morson Projects were appointed by National Grid to upgrade the out-of-balance protection on their Mechanically Switching Capacitor (MSC) at a number of substations in the Midlands and the South.
Scottish Power
Protection & Control (P&C) Panels
Morson Projects have been appointed by Scottish Power to carry out a wide range of projects including design, manufacture, testing and delivery of Protection & Control Panels across their power networks.
National Grid
Heysham Operational Tripping System (OTS)
Morson Projects were appointed by the National Grid to support them on the Heysham Operation Tripping Scheme (OTS), which identified the current and future need for additional generation sources to be incorporated into the Transmission System, in the North West 1 and North West 2 regions.
Carillion
Cilfynydd 400kV Substation
Morson Projects were appointed by Carillion to support them with the engineering for a new shunt reactor bay which was installed as an extension to the existing 400kV substation at Cilfynydd.
Sellafield Ltd
B13 Lifting Beam & Stand
Morson Projects were appointed by Sellafield Ltd to carry out the design, analysis, manufacture and CE marking for a new B13 Lifting Beam & Stand.
Horizon Nuclear Power
Consultancy Services for Wylfa Newydd
Morson Projects were appointed by Horizon Nuclear Power to provide Technical Services for the proposed Wylfa Newydd nuclear power plant in Anglesey, Wales.