Network Rail
CTRL Tunnel Ventilation Control
Morson Projects’ Ematics division were appointed by Network Rail to provide specialist software engineering and systems assurance for implementation of the Ventilation Control System for the three CTRL tunnels.
Jacobs Engineering
Dublin Port Tunnel
Morson Projects’ Ematics division were commissioned to conduct a site survey of the Dublin Port Tunnel’s network to investigate both the design concept, current performance and reliability of it’s infrastructure.
Medway County Council
Tunnel Control, Data Communications & Electrical Subsystem Replacement
The 725 metre long Medway Tunnel is an immersed tube dual two‐lane tunnel with cut and cover approaches that was opened in 1996. As the proprietary control system had reached and of life and was no longer supported, a new SCADA control system was required to reduce risk of component failure.
Transport For London
Eastway Tunnel Lighting
Morson Projects were appointed by Transport for London to support them with a lighting upgrade at the Eastway Tunnel.
Transport For London
Hanger Lane Tunnel Lighting
Morson Projects’ Ematics division were appointed by Transport for London to support them with lighting upgrades to the Hanger Lane Tunnel.
TT2 Limited
Tyne Tunnels Control System Upgrade
Morson Projects’ were appointed by TT2 Limited as the Control Systems Integrator for some constrol system upgrades of the Tyne Tunnels.
Merseytravel
Unified SCADA System
Morson Projects’ specialist controls system division Ematics was appointed by Merseytravel to provide a unified SCADA System for two tunnels.