Network Rail
Innovative Railway ‘TPCMS’ Electrical Control System
The new and improved ‘Version 5’ of the TPCMS has successfully gone live in the London area of Raynes Park. The delivery of this control system marks a new era of intelligent control software which will improve safety and provides a contemporary platform for future innovation.
Vertical Aerospace
JIG & TOOLING DESIGN FOR THE VERTICAL AEROSPACE VX4 EVTOL AIRCRAFT
Morson Projects’ Jig & Tool team have been working with Vertical Aerospace to deliver the design and supply of assembly tooling, delivering over 30 items of equipment that have been used to assemble the revolutionary new aircraft.
National Composites Centre & Dstl
Advanced Design of Composites Structures for future Combat Aircraft (ADCoSCA)
The team at Morson Projects have been collaborating on the latest technologies for the next generation of lightweight, strong and resilient combat aircraft composite structures.
Leonardo Helicopters Strategic Partnering Agreement
Leonardo and Morson Projects have been working together for more than 20 years, with this our latest contract securing the partnership into its third decade.
Empire Cartridges
Techman TM5 Cobot Integration
Through “Made Smarter” matched government funding, Morson Projects helped Empire Cartridges to upscale their manufacturing output of shotgun cartridge shells by investing in an Industry 4.0 solution that will enable the business to produce and pack in excess of 1million cartridges each year.
STS Aviation Services
Digital Capture & Modelling for Aircraft Hangar
The teams at Morson Projects and sister company, Waldeck, have recently worked collaboratively to assist our client, STS Aviation Services, in understanding the operational capacity of one of their aircraft hangars.
Bombardier
Learjet 85 Joint Definition & Detail Design Phase Support
Morson Projects were appointed by Bombardier to deliver Design Phase Support for the Learjet 85.
EDF Energy
Digital Capture of Sizewell C
As part of EDF’s proposed new nuclear power station, Sizewell C in Suffolk, our Digital Capture team were appointed to undertake a UAV survey of the areas surrounding the existing nuclear facilities Sizewell A & Sizewell B.
BAE Systems
New Advanced Hawk
Morson Projects internal process of concurrent engineering capability allows us to deliver in challenging timeframes – we delivered the new wing design for the advanced Hawk in 7 months, when the initial forecast was 18 months.
Dounraey Site Restoration Ltd
Decommissioning Operatives Framework
Morson Projects currently hold a Decommissioning Operatives Framework with Dounraey Site Restoration Ltd.
Digital Capture of Port
Our Digital Capture team were commissioned by our long-term Ports client to carry out an aerial survey. From the data we then produced a surface model of the terrain to create a topographical survey.
BAE Systems
Dreadnaught Submarine Power Plant Controls
Controlling the power plant of a Nuclear Submarine is an exceptionally sensitive task. Morson Projects set up a dedicated and highly experienced team of fourteen software engineers to develop the control software from our Belfast office.