National Composites Centre & Dstl

Advanced Design of Composites Structures for future Combat Aircraft (ADCoSCA)

The team at Morson Projects have been collaborating on the latest technologies for the next generation of lightweight, strong and resilient combat aircraft composite structures.

Leonardo Helicopters Strategic Partnering Agreement

Leonardo and Morson Projects have been working together for more than 20 years, with this our latest contract securing the partnership into its third decade.

Dounraey Site Restoration Ltd

Decommissioning Operatives Framework

Morson Projects currently hold a Decommissioning Operatives Framework with Dounraey Site Restoration Ltd.

Jacobs Engineering

Dublin Port Tunnel

Morson Projects’ Ematics division were commissioned to conduct a site survey of the Dublin Port Tunnel’s network to investigate both the design concept, current performance and reliability of it’s infrastructure.

Medway County Council

Tunnel Control, Data Communications & Electrical Subsystem Replacement

The 725 metre long Medway Tunnel is an immersed tube dual two‐lane tunnel with cut and cover approaches that was opened in 1996. As the proprietary control system had reached and of life and was no longer supported, a new SCADA control system was required to reduce risk of component failure.

Transport For London

Eastway Tunnel Lighting

Morson Projects were appointed by Transport for London to support them with a lighting upgrade at the Eastway Tunnel.

National Grid

Heysham Operational Tripping System (OTS)

Morson Projects were appointed by the National Grid to support them on the Heysham Operation Tripping Scheme (OTS), which identified the current and future need for additional generation sources to be incorporated into the Transmission System, in the North West 1 and North West 2 regions.

Carillion

Cilfynydd 400kV Substation

Morson Projects were appointed by Carillion  to support them with the engineering for a new shunt reactor bay which was installed as an extension to the existing 400kV substation at Cilfynydd.

Electricity North West

Sellafield G9 & G10 Replacement

Morson Projects were appointed by Electricity North West to support them with the engineering works for the replacement of two Grid Transformers at Sellafield.

Axiom DSA

Multi-discipline Design Services for Sellafield

Morson Projects have been engaged via the Sellafield Ltd DSA framework from its inception in 2012 and as the framework is in its third five year cycle we are currently delivering a range of O&M, design and asset lifecycle projects to the SL client.