Project overview
Our team worked closely with Spirit Aerosystems to carry out a wide range of support throughout the project. Our team were also responsible for the complete fixed leading edge residual strength analysis to support the A350-1000 First Flight, including UERF, Hail Strike and MLP.
OUR SOLUTION
Some of the items included within the design and analysis tasks were as follows:
- Buttstraps
- Closing Rib
- De-Ice Region
- Fixed System Brackets
- Flap Track Ribs
- FTI Provision
- Hold Down Ribs
- Intermediate Ribs
- J-Nose Composite Panels
- Lower Removable Composite Panels
- Spreader Plates
- System Raceway
In support of the design of the items above, Morson Projects was responsible for producing and using:
- Analysis Using Excel, Mathcad, NASTRAN, PATRAN & ISAMI
- Analysis Using ISAMI
- Complete Programme Management
- Design Deliverables
- Detailed Design Using CATIA V5, R23 (CATIA Format Applicable To The A350 Programme)
- Detailed Finite Element Models (DFEM)
- DFM Drawings
- Exceedance Check Reports (Residual Strength)
- F&DT Reports
- Fatigue & Damage Tolerance
- FLE IFEM Models For MLP, UERF & Hailstrike (Residual Strength)
- Frontier & Interface Drawings,
- Full Utilization of PDMLink
- Interface Loads Reports
- Mass Reporting (BOM)
- Static Sizing Reports
- Stress Deliverables
- Stress Reports (C-Scheme & DFM)
- Stress Sort Tools
Our services
Delivering the project requirements to an agreed Statement of Work (SOW), the Morson Projects team carried out services to include:
- Project & Programme Management
- Structural Design & Analysis