Project overview

Morson Projects were appointed by Transport For London to support them with the Control Systems Upgrade as part of a wider programme of works for the Rotherhithe Tunnel.

OUR SOLUTION

The Rotherhithe road tunnel crosses beneath the River Thames in East London, connecting the Ratcliff district of Limehouse in Tower Hamlets to Rotherhithe in Southwark.

Due to the aging infrastructure, a new Tunnel Environmental System was required to control and monitor day-to-day vehicle pollution, fire detection, and tunnel lighting / ventilation and smoke control demands.

The Control System was developed using the most up to date Modicon Programmable Controllers, and the latest version of the FactoryLink Supervisory Control Data Acquisition system connected on a high speed fibre optic network to provide a usable and durable product.

The provided system included Fire detection equipment (Distributed Temperature Sensor), Pollution Monitoring equipment, UPS, and override control & status panels, as well as recording and logging of alarms, power consumption, lighting, and ventilation.

The project was completed successfully, on time and within budget, increasing safety for all tunnel users. The flexible and open solution allows for future expansion, with ease of maintenance and interfacing in mind.

The following systems and services have been designed and installed:

Systems:

  • Schneider Modicon PLC System
  • FactoryLink SCADA System
  • High Speed Fibre Optic Ethernet Architecture

Delivering the project requirements to an agreed Statement of Work (SOW), the Morson Projects team carried out services to include:

  • SCADA & PLC Control Systems
  • Software Development
  • Installation
  • Testing & Commissioning
  • Training & Maintenance